A major mining study has put a multi-billion-dollar price tag on a planned copper mine near the Orange River in southern Namibia. Koryx Copper has released results from a pre-feasibility study for its Haib Copper Project, estimating initial building costs at about US$2 billion dollars for a mine projected to run for 24 years. In plain terms, a pre-feasibility study is a detailed check to see if a mining project makes financial and technical sense before companies spend even more on a final blueprint. Koryx estimates the project has an after-tax net value of US$2.5 billion, meaning the expected profits over time, discounted back to today’s value, outweigh the costs. Over its first ten years, the mine is projected to produce around 135 000 metric tons of copper a year, alongside smaller amounts of gold and molybdenum, a metal used to strengthen steel. The company plans to spend the next year on a final feasibility study, securing permits, and lining up funding, with construction aimed at starting in early 2028
The post Koryx Copper puts Haib mine development cost at US$2 billion appeared first on Future Media News.